Excavators, dumpers, rollers, telehandlers and access
What do plant hire rates actually cover?
Two quotes for the same machine can be hundreds of pounds apart and both be honest, because a day rate is not a price for a job. Delivery and collection, fuel, damage waiver, idle days and the minimum hire period all sit outside the headline number, and on a two day job the transport can cost more than the machine. Here is how to read a rate, then quotes from hire companies covering your postcode.
What happens next
- Tell us the machine, the duration and the site access. Two minutes, no account.
- We pass your details to plant hire companies covering your postcode, and to no one else.
- They confirm availability and quote you directly, transport included. Compare, choose, or walk away.
Plant Hire Rates is a free introduction service operated by Ellul Solutions Ltd; we pass your details to plant hire companies who quote you directly. We may receive a fee from providers; you pay nothing and are under no obligation. We are not a hire company and we are not affiliated with HSE, the Construction Plant-hire Association or any body named here. Nothing here is health and safety or legal advice: duties are summarised from HSE guidance read on 14 August 2026 and must be followed in full from the source. We publish no rates because there is no official UK plant hire rate schedule.
What sits inside a plant hire rate, and what sits outside it
Last updated
The headline rate is the machine. Everything below is either inside it or on top of it, and which is which varies by hire company. Go through this list on the phone before you accept a rate, because these are the lines that turn a cheap quote into an expensive invoice.
No rates appear in this table. There is no official UK schedule of plant hire rates, and published rate cards vary by machine size, region, depot, duration and account status by more than any single figure could honestly represent. So we set out what is charged and how it behaves, and get you quotes for your actual job. Safety and inspection statements are as published by HSE and were read on 14 August 2026.
| Line | How it usually behaves | What to ask before you book |
|---|---|---|
| The machine rate | Quoted per day or per week, and the weekly rate is usually far better value than five day rates. Rates step by machine size and by age or spec of the fleet | The daily rate and the weekly rate, so you can see the break-even point |
| Delivery and collection | Charged as two separate movements, priced from the depot. On a one or two day hire this is often the largest single item on the invoice | Delivery and collection quoted as a figure, both ways, to your postcode |
| Fuel | Commonly delivered full and charged for refuelling on return, at a rate set by the hire company. Some include a tank, most do not | Whether it comes full, and the refuelling charge if it comes back empty |
| Damage waiver or hire in plant insurance | Usually a percentage of the hire charge, and usually optional only if you can evidence your own cover. Excesses can be substantial | The waiver percentage, the excess, and what it does not cover |
| Minimum hire period | Many rates carry a minimum, so a machine on site for a day and a half can bill as several days | The minimum hire period in days, in writing |
| Idle time and standing days | The clock generally runs while the machine is on your site, whether or not it turns a wheel. Weekends and bad weather are commonly chargeable | Whether weekends and non-working days are charged, and any off-hire notice period |
| Attachments and consumables | Breakers, augers, grading buckets, chains and points are usually priced separately, sometimes with their own transport | Attachments listed and priced on the same quote as the machine |
| The operator, on operated hire | Charged by the hour or by the shift with a minimum, plus overtime rates, and travel time is sometimes chargeable | The shift length, the overtime rate, and whether travel time is inside the shift |
| Off-hire and return condition | Charges commonly follow for cleaning, damage and late off-hire. The off-hire number is your proof the clock stopped | How to off-hire, and always keep the off-hire reference |
- On short plant hires, transport to and from site is frequently the largest single item on the invoice, because delivery and collection are two separate priced movements charged from the depot regardless of how long the machine is used.
- HSE states that lifting equipment thorough examinations should be conducted every 6 months for lifting accessories and for equipment used to lift people, and every 12 months for all other lifting equipment, unless an examination scheme specifies other intervals.
- HSE states that employers must ensure all persons who use work equipment have received adequate training for the purposes of health and safety, under regulation 9 of the Provision and Use of Work Equipment Regulations 1998.
Cite this page
“What sits inside a plant hire rate, and what sits outside it”, Plant Hire Rates, https://planthirerates.co.uk/ (updated 2026-08-14). No rates appear in this table. There is no official UK schedule of plant hire rates, and published rate cards vary by machine size, region, depot, duration and account status by more than any single figure could honestly represent. So we set out what is charged and how it behaves, and get you quotes for your actual job. Safety and inspection statements are as published by HSE and were read on 14 August 2026.
Worth knowing
Every figure sourced and dated.
Operated versus self-drive plant hire: what actually transfers
Operated hire supplies the machine and the operator. Self-drive supplies the machine only, and the training, competence and supervision duties stay with you.
What a plant hire day rate includes, and the six things it does not
A plant hire day rate is the machine only. Delivery, collection, fuel, damage waiver, minimum hire periods and idle time usually sit outside it. How to compare quotes.
Mini digger hire rates: what changes the price on a small machine
Mini digger hire rates step by machine weight, hire duration and depot distance. Why a 1.5 tonne machine and a 3 tonne machine are different hires, not sizes.
Plant hire transport costs: the biggest hidden cost on a short hire
Delivery and collection are two separate charges priced from the depot. On one and two day hires transport often exceeds the machine rate. How to cut it down.
Frequently asked
What are typical plant hire rates in the UK?
We do not publish rates, because there is no official UK rate schedule and real prices vary by machine size, depot, duration, region, season and account status by more than any single figure could honestly cover. What is consistent is the structure: a machine rate, plus delivery and collection, plus fuel, plus damage waiver, plus any attachments, subject to a minimum hire period.
Is plant hire charged per day or per week?
Both are quoted, and the weekly rate is usually far better value than five separate day rates. Ask for both and work out the crossover: on many jobs a full week costs little more than three days, and you pay transport once either way.
What is the biggest hidden cost in plant hire?
Transport. Delivery and collection are two separate charges priced from the depot, they do not shrink with a shorter hire, and on one and two day jobs they frequently exceed the machine rate. Compare quotes on the delivered total for your postcode, not on the headline rate.
Do I need a card to operate hired plant?
HSE's guidance sets out a duty rather than a card: employers must ensure everyone who uses work equipment has received adequate training for health and safety purposes under PUWER regulation 9, and self-propelled work equipment should only be driven by workers trained to drive it safely. Hire companies and principal contractors commonly require a recognised competence card as their evidence, so expect to be asked.
How often does hired lifting equipment need thorough examination?
HSE states thorough examinations should be conducted every 6 months for lifting accessories and for equipment used to lift people, and every 12 months for all other lifting equipment, unless an examination scheme drawn up by a competent person specifies other intervals. Ask for the current report and check the next due date falls after your hire ends.
Is this quote service really free?
Yes, free to you, with no obligation to accept any quote. We pass your details only to plant hire companies covering your area; we may receive a fee from those providers, which is how the service is funded.